|


Last additions - pklongball's Gallery |
|
|
|
|

Random files - pklongball's Gallery |

28 AprilThe labor crew hand dug this trench around the property perimeter from the septic tank. A series of pipe and boxes will be installed to drain the run out from the septic tank as well as the grey water from the showers and sinks and any water from rain on the land. Ends in the street sewer drainage system.pklongball
|
|

16 March 2009A wall begins. This wall happens to be the left wall of the storage room and the master bedroom doorway next to the column.pklongball
|
|

June 22The outdoor cabinet for the shoes and the gas bottles now is almost finishedpklongball
|
|

June 28The roof is almost ready for the tilepklongball
|
|

27 OctoberMore concrete and back breaking laborpklongball
|
|

6 March 09'Two of the roof crew welding in the small cross-members to the support channels. The square tube will be the support for the roof tile.pklongball
|
|
|

28 March 2009This roof valley will be completed in short order and should have a nice tight fit of tilespklongball
|
|

|
|
|