July 21Mrs thinks it's time to move so she brought in some stuff we can store away for now.pklongball
|
|

2 JuneAnd to end this segment we have the Thai Tileman's version of a wet saw for cutting tile. It's a small Makita circular saw with a small tube of water being siphoned from a bucket to cool the cut and bladepklongball
|
|
|

4 Jan 09 Site visitThis is what we saw on arrival today. All the rebar forms were trucked in today and the foundation crew was hard at it carrying and placing them into position for all 31 holes. Hot, thirsty work. But they look like they can handle it.pklongball
|
|

June 23Here is Tile man 1's main helper. She does all the finish work after tile man sets the tile. In this case the granite install cleaning and finish groutpklongball
|
|

11 MayA more distant shot of the cabling installed for the 3 phase power and meter. The closer pole is the pole we installed for our connection. The pole opposite is the project installed pole. We had to have the cabling and pvc installed to get ready for the new meter in a month or two.pklongball
|
|

The Blessing finishedOne of the 2 columns that we raised during the ceremonypklongball
|
|

27 OctoberView from the pump house walk to the new walk to get to the house. pklongball
|
|

|
|
|