|


| Last additions - pklongball's Gallery |
|
|
|
|
|

| Random files - pklongball's Gallery |

21 MayThis is a view that you don't see every day. Sparky is up on our pole and he is adding some steel brackets and U bolts to secure the PVC and the PE pipe to the pole. He asked me if I wanted this and I of course said yes. This type of thing will also be used under the house in the crawl space where the PE comes up from the trench and goes to the load center conduit under the floor.pklongball
|
|

June 12Today's view of the back of the house and the new guttering around the veranda eaves. Once it is painted it will almost be invisiblepklongball
|
|

June 28One of the 4 casement windows in the bedrooms. Two left swing and two right swing. Double handle locks on each window.pklongball
|
|
|

15 AprilA look down the side of the kitchen wall and the back veranda showing the newly plastered walls.pklongball
|
|

23 Jan 2009The day after the pour and no one on site but a water lady. Her task is to show up once a day and wet down the area and keep the wood and cement wet. 3 days and they will remove the forms and begin work on the sub floor panels.pklongball
|
|

22 Jan 2009This was a hard 4 hours of work and the pouring crew never took a water or food break that I saw. We bought lunch today!pklongball
|
|

17 March 2009The view today March 17. happy St Patty's Daypklongball
|
|

|
|
|