The Ladies Auxillary and Sewing Club6 Jan 09 In this scene the ladies are sitting around drinking tea and passing the time with a little gossip. Mrs. told them she will show the photo to the boss and see what he thinks^^^^^big laugh at this!! In reality it's just before lunch and the pause is due to a lack of gravel to make concrete. The delivery is on the way and the check is in the mail and the crew bus is on the way.pklongball
Day 21 Starting to form the lower columnWell they have just a few of the footings poured and already have started to form around the rebar on the poured footings for the next piece of the puzzle. This piece is the lower part of the column that will reach to ground level and just above.pklongball
Day 21 Starting to form the lower column6 Jan 09 The form work goes on as does the pouring of concrete for the remaining footingspklongball
Day 21 Starting to form the lower column6 Jan 09 Another view of the form workpklongball
Khun PK6 Jan 09 Well this is a fine kettle of fish you got me into!!pklongball
Footings and Columns10 Jan 2009 The last view of the open holes. Next step is to fill in and start making the rebar forms for the beams joining all columns together.pklongball
Footings and Columns10 Jan 2009 This will be the last photo of open holes. All the footings will be back-filled tomorrow.pklongball
Trenching machine10 Jan 2009 This is the trenching machine. One man, one pick and no shoes.pklongball
Meter plumbing10 Jan 2009 A small not so deep trench was dug across the road and the connection was made. A hole in the walk was created and the meter installed.pklongball