|

|

29 AprilThe now installed front door frame and the finished wall area. Should look nice when the glass and doors are in place and finished.pklongball
|
|

29 AprilHere we have the stairman working on the back veranda stairway. First was a concrete pad. Now the first course of brick to build the first step.pklongball
|
|
|

2 MayA view from the back looking at the now partially complete back veranda steps. Should look good whn he's done and the tile and sandwash are in place.pklongball
|
|

2 MayWe see the stair man working on the second of 3 steps up/down from the back veranda. pklongball
|
|

5 MayHere we have one of the 2 half walls that will create the wet and dry areas for the master bath shower and toilet. This was just built in the last day or so.pklongball
|
|

8 MayDelivery man checking the boxes of tilepklongball
|
|

8 MayDelivery man checking the boxes of tilepklongball
|
|

8 MayToday we had a delivery of the tile for the main bath, main floors and front balcony. We have Mrs PK and the delivery man checking the quantity and type of tile delivered. She has been a great manager for our team.pklongball
|
|

8 MayToday we had a delivery of the tile for the main bath, main floors and front balcony.pklongball
|
|

8 MayHere is a new thing. Wife decided she wanted a recessed area in the wall above the bed headboard to put items such as books, flowers , knick-knacks or whatever. So we had the crew saw cut out the area and this will be finished off in some nice way.pklongball
|
|

8 MayWe can see here a view of the half walls in the master bathroom. We thought this would be a nice feature to keep most of the water in the shower. Have not decided if a glass door will be bought. Most likely not until after I win the lottery.pklongball
|
|
|

|
|
|