June 3Here now we have the beginning of the kitchen cabinets. We hired a local cabinet company to do our work for the kitchen. All wood and wood products.pklongball
June 3One of the wall cabinets before installationpklongball
June 3More of the cabinet install. Looking here at the bas cabinets for the cooking HOB and the Oven and Microwave cabinetpklongball
June 6The work in the kitchen is moving along and now the sink base is in place along with the wall units oven the HOB areapklongball
June 6Looking to the wall units for the exhaust hood and oven/microwavepklongball
June 8One of the built-in crew do some wood workingpklongball
June 8This guy stood on this ladder like this for at least 20 minutes trying to snake an electric cable down behind the cabinet to the place where a lite will be locatedpklongball
June 10All the base and wall units are installed now and the work moves to finishing the doors and suchpklongball
June 12Today a threesome showed up to sand and apply a first coat of lacquer to the cabinet interiors. I don't have to comment about the great way this guy is standing on the ladder. I would bet any one of us that has ever used a step ladder has done something similar.2 commentspklongball
June 22Here we have the 2 pieces of granite for the cabinet tops in the kitchen. Tile man will be doinf the work.pklongball
June 22The cabinet man came out yesterday to cut the openings for the HOB and the sink. They enede up removing one interior partition as the sink is bigger than they planned. Or should I say did not plan. They had pictures and drawings of the exact sink we bought and the last 3 weeks we had the sink but they still built the base for the sink too small, plus its not centered on the window as I asked.pklongball