28 AprilWe have some work starting on the gypsum ceiling. The crew came in today and started outside.pklongball
28 AprilTwo of the ceiling crew hanging the metal gridwork for the back veranda ceiling.pklongball
28 AprilA look at some of the metal stringers and grid used to prepare for the gypsum ceiling around the eaves.pklongball
28 AprilJust another view of the workers and how they do it.pklongball
28 AprilA look under the ceiling to see the metal gridwork for the "green" board that will be installed later.pklongball
29 AprilMore ceiling grid in preparation for the sheetrockpklongball
5 MayHere we can see a more normal stepped ceiling in the smaller guest bedroom.pklongball
5 MayAnother view of the living room ceiling that is partially completepklongball
5 MayThis part of the living room ceiling shows the 30 cm step from the lower to higher ceiling. The larger 30cm step was decided to allow install of the ceiling aircon unit later.pklongball
5 MayThe ceiling boys were in today and they go more "rock" installed. Here we can see a square hole that will be a service access to the attic space.pklongball
5 MayHere we have a view of the living room ceiling and the partly installed rock. This look is back towards the front door.pklongball