2 JuneOne of the steelworkers place another length of the steel between the columnspklongball
|
|
|

29 AprilThe sewer drain trench along one side of the land.pklongball
|
|

The Blessing finishedOne of the 2 columns that we raised during the ceremonypklongball
|
|

Box Beams17 Feb 2009 They started the day measuring the "C" channel and cutting to length and welding pieces together to get the correct lengths and then sandwiched two pieces together to make a bx beam. Each length will span several columns to form the support for the rest of the roof structure.pklongball
|
|

30 MayHere we have a worm's eye view of the fish line that the tile man uses to get a straight line for his tile.pklongball
|
|

13 Jan 2009This view in the early stage of steel forming we can see pretty clearly the 16 mm steel used in the floor beam supports.pklongball
|
|
|

|
|
|