26 March 2009And again some arrows point to another section of raceway and the method to hang it. Some holes are drilled into the steel of the roof and they secure it with big "pop" rivets. This will make his cabling job a breezepklongball
|
|
|
|

18 MaySparky is at the other end of the 50 meter pipe pulling out the fish wire in preparation for laying the pipepklongball
|
|

Friday the 13thThe Bucket brigade passing the concrete to finish the balcony. This section took about 4 hours to finish.pklongball
|
|

4 AprilFrom the left front view we can see the roof gable is the next finish that needs to be done.pklongball
|
|

June 26Door man working on the guest bedroom door.pklongball
|
|

|
|
|