Construction Photos
Home > User galleries > Max&Bee-in-CM

Preparations of the Land (May 2010)


IMG_3952.JPG

We purchased 3 rai of land in San Kamphaeng, Chiang Mai. Land was a rice field, about 70cm below the main road level. Soil infill is being done to bring the land above road level.

Plan is to build a 250 square metre single floor house, double car garage, observatory, 2.5 metre high perimeter fence, and some nice landscaping. We also want to have a small vege garden, and lots of fruit trees, just for fun.

The house design is based on several homes in Melbourne, Australia. The house includes 3 bedrooms, 2 bathrooms, a study room, an open plan kitchen/family room/meals area, and a laundry room. It also includes an outdoor alfresco style area for eating, BBQ, relaxing, and some other activities.

The house is being built with local sourced labor, and we are doing the planning, purchasing and project management ourselves. Work started on 7th May 2010.

21 files, last one added on Jun 24, 2010
Album viewed 77 times

Main House - Foundations, Beams, Columns


IMG_3373.JPG

Tis albums documents the foundation holes, the columns, and the horizontal beams

164 files, last one added on Jul 11, 2010
Album viewed 146 times

Main House - Roof Metal


IMG_1280.JPG

Work on the roof metal began on 27 July 2010 with the delivery of metal beams.
This was followed by painting of red oxide, and installation.

We first thought it was finished on 31 August, but when the roof tile guy came and
tried to bounce, the roof moved quite a bit.

Repairs then began to first reinforce the roof in certain sections. The repairs lasted about
2 weeks as the roof metal structure was converted into a truss system. The roof metal
was completed on 26 September, and tile installation resumed.

56 files, last one added on Sep 29, 2010
Album viewed 96 times

Main House - Roof Tiles


IMG_1430.JPG

Roof tiles arrived in 2 trucks on 2 August.

Installation was delayed by 2 weeks once the roof metal started to sag, due to an
improperly designed roof using no trusses.

Installation was restarted on 25 September, and completed on 28 September.

26 files, last one added on Sep 29, 2010
Album viewed 85 times

Observatory


IMG_4510.JPG

An observatory will be built to house a telescope. A solid concrete pier is built, isolated form the floor of the observatory, to dampen vibrations in order to do astro-photography. The telescope will be purchased from the US.

The observatory will have a movable room, and an sealed control room. The size of the building is 6 metre x 3 metre. The observatory will be located in San Kamphaeng, about 18 km from Chiang Mai. Light pollution is fairly low, and the land was primarily chosen for this factor.

17 files, last one added on Jun 19, 2010
Album viewed 55 times

Fence


IMG_5569.JPG

We decided to go with concrete posts and a bamboo fence. The land needs 100 posts and 100 of 3 m bamboo fence sides. Total cost of the posts and bamboo is 48,000 baht.

23 files, last one added on Jul 10, 2010
Album viewed 84 times

6 albums on 1 page(s)

Last additions - Max&Bee-in-CM's Gallery
IMG_1280.JPG
Last day working on the roof metal - finishing touchesMaking the welds strongerMax&Bee-in-CMSep 29, 2010
IMG_1315.JPG
Last day working on the roof metal - finishing touchesMaking all the welds stronger and painting the jointsMax&Bee-in-CMSep 29, 2010
IMG_1430.JPG
Installing the side roof tilesMax&Bee-in-CMSep 29, 2010
IMG_1458.JPG
Roof tile work resumes now that the metal is almost finishedMax&Bee-in-CMSep 29, 2010

Random files - Max&Bee-in-CM's Gallery
IMG_4766.JPG
Foundations floodedHave to wait until it dries to continueMax&Bee-in-CM
IMG_4188.JPG
Metal platesThe metal plates in the back of the car, looking for a drill shop now. Need to drill 3 plates.Max&Bee-in-CM
IMG_3984.JPG
Work benchVery functional, and looks great too. made from all natural materials.Max&Bee-in-CM
IMG_5369.JPG
Formwork completeLooking at the front right of the houseMax&Bee-in-CM
IMG_0573.JPG
Space foil insulation under the tilesMax&Bee-in-CM
IMG_4769.JPG
Foundations floodedRainy season has started earlyMax&Bee-in-CM
IMG_5142.JPG
Ready for installWaiting to be installed into placeMax&Bee-in-CM
IMG_0616.JPG
The (incompetent?) roof metal guy thinks about how to jack up the roofMaybe incompetent is too strong a word - but he was quick to assign blame to poor quality metal, bad architect, bad engineer, CPAC tiles too heavy, roof too big, etc - everyone except himself.Max&Bee-in-CM