IMG_6908.JPG
4000 or so tiles sit waitingMax&Bee-in-CM
IMG_6905.JPG
5 rolls of space foil originally, and 3 more laterMax&Bee-in-CM
IMG_6895.JPG
Unloading the truckMax&Bee-in-CM
IMG_6889.JPG
Truck fully loaded with tilesMax&Bee-in-CM
IMG_6885.JPG
2 trucks arrive with roof tilesMax&Bee-in-CM
IMG_0366.JPG
Taking the tiles up to the roofMax&Bee-in-CM
IMG_0339.JPG
tiles moved from the front to under their espective installation pointsMax&Bee-in-CM
IMG_0338.JPG
Ready to be taken upMax&Bee-in-CM
IMG_0332.JPG
Moving tiles from front to the houseMax&Bee-in-CM
IMG_0324.JPG
Over 4000 tiles to move, about 10 people in the crewMax&Bee-in-CM
IMG_0452.JPG
Half the right side and back done in a dayMax&Bee-in-CM
IMG_0430.JPG
Half the right side and back done in a dayMax&Bee-in-CM