happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > Max&Bee-in-CM > Main House - Foundations, Beams, Columns

IMG_3360.JPG
ready to measuretaking the first stepsMax&Bee-in-CM
IMG_5035.JPG
Master bedroomAnther view of the master bedroom rebar ground beam, being held up by a stick as we didnt get enough soil infill.Max&Bee-in-CM
IMG_3373.JPG
the builder checks the plansusing the hood of the car as a tableMax&Bee-in-CM
IMG_5039.JPG
Right angle rebarCloseup of the rebar work for the right corner of the house, the study room.Max&Bee-in-CM
IMG_3538.JPG
check the layoutcheck, double check and triple check the layoutMax&Bee-in-CM
IMG_5040.JPG
Front right cornerLooking at the front right of the house, from the study room to the master bedroom.Max&Bee-in-CM
IMG_3540.JPG
measuring the edgeshave to get the edge straightMax&Bee-in-CM
IMG_5067.JPG
Master bedroomThe rebar ground beams for the master bedroom on the left, looking at the front of the house.Max&Bee-in-CM
IMG_3543.JPG
Laying out the house on the landthe yellow soil in contrast to the rice fieldMax&Bee-in-CM
IMG_5070.JPG
LaundryThe rebar for the ground beams of the laundryMax&Bee-in-CM
IMG_3558.JPG
Workers house side viewOur electricity pole in the foreground. Later when we dig holes for the fence, we will put some concrete around the pole, currently its only dug in.Max&Bee-in-CM
IMG_5071.JPG
Toilet, bathroom and bedroomLooking at the toilet in the front of the picture, the bathroom on the right, and the small bedroom next to it on the left.Max&Bee-in-CM
164 files on 14 page(s) 1

Debug Info 
Debug Output: show / hide