Main House - Foundations, Beams, Columns
|
|
|
|

Master bedroomAnther view of the master bedroom rebar ground beam, being held up by a stick as we didnt get enough soil infill.Max&Bee-in-CM
|
|

the builder checks the plansusing the hood of the car as a tableMax&Bee-in-CM
|
|

Right angle rebarCloseup of the rebar work for the right corner of the house, the study room.Max&Bee-in-CM
|
|

check the layoutcheck, double check and triple check the layoutMax&Bee-in-CM
|
|

Front right cornerLooking at the front right of the house, from the study room to the master bedroom.Max&Bee-in-CM
|
|
|

Master bedroomThe rebar ground beams for the master bedroom on the left, looking at the front of the house.Max&Bee-in-CM
|
|

Laying out the house on the landthe yellow soil in contrast to the rice fieldMax&Bee-in-CM
|
|

LaundryThe rebar for the ground beams of the laundryMax&Bee-in-CM
|
|

Workers house side viewOur electricity pole in the foreground. Later when we dig holes for the fence, we will put some concrete around the pole, currently its only dug in.Max&Bee-in-CM
|
|

Toilet, bathroom and bedroomLooking at the toilet in the front of the picture, the bathroom on the right, and the small bedroom next to it on the left.Max&Bee-in-CM
|
|
164 files on 14 page(s) |