Chiyman's Low Cost House - part 1 - substructure and ground beams


DSCF4946.JPG

42 files, last one added on Jan 18, 2011
Album viewed 78 times

Chiyman's Low Cost House - Part 2 - Ground slab and ground to first floor cloumns


DSCF4955.JPG

34 files, last one added on Jan 18, 2011
Album viewed 61 times

Chiyman's Low Cost House - Part 3 - First Floor beams and slab


DSCF5046.JPG

17 files, last one added on Jan 18, 2011
Album viewed 49 times

Chiyman's Low Cost House - Part 4 - First Floor Columns and GF blockwork


DSCF5111.JPG

22 files, last one added on Jan 18, 2011
Album viewed 52 times

Chiyman's Low Cost House - Part 5 - Roof Construction


DSCF5118.JPG

27 files, last one added on Jan 18, 2011
Album viewed 55 times

Chiyman's Low Cost House - Part 6 - Internal Construction


DSCF5152.JPG

5 files, last one added on Jan 22, 2011
Album viewed 47 times

Chiyman's Low Cost House - Part 7 - External finishing on main house.


DSCF5154.JPG

13 files, last one added on Jan 22, 2011
Album viewed 66 times

 

7 albums on 1 page(s)

Last additions - chiyman's Gallery
DSCF5152.JPG
First floor bathroom windowchiymanJan 22, 2011
DSCF5153.JPG
1st Floor Bathroom - A lot of work to get this finished.chiymanJan 22, 2011
DSCF5154.JPG
A view from the farm land of the rear of the house. 1st floor balcony can be seen.chiymanJan 22, 2011
DSCF5155.JPG
Side view of main house building. Stucco nearly completed.chiymanJan 22, 2011

Random files - chiyman's Gallery
DSCF4917.JPG
The Electric man came to give us power 2!chiyman
DSCF4935.JPG
Formwork for ground beamsI checked carefully to ensure that there was sufficient space between the reinforcement and the wooden formwork. Some adjustment was necessary. If the steel dosent have a concrete cover (of sufficent thickness) then it will be exposed to the atmosphere and will corrode. At best this will show as a dirty brown mark on the exterior of the structure and at worst, over time could cause structural failure.chiyman
DSCF4992.JPG
Piles of Sand and stone for concrete mixingI should have insisted that a wooden structure be constructed to hold the sand and stone as just dumping it on the ground and using it caused a lot of wastage and required a big clean up later on. chiyman
DSCF5027.JPG
Precast slab delivery/unloadingchiyman
DSCF5072.JPG
A view from the farm landchiyman
DSCF5062.JPG
The start of roof construction - good job the wind wasnt blowing!!chiyman
DSCF4938.JPG
All set and ready for mixing concrete for the ground beamschiyman
DSCF5030.JPG
Unloading Precast concrete slabschiyman