Chiyman's Low Cost House - Part 2 - Ground slab and ground to first floor cloumns
|
|
|
The waste from the downstairs toilet will be collected in this tank formed from precast concrete rings - this one is 4 rings deep.chiyman
|
|
Ground slab formwork completed and ready for the pourchiyman
|
|
Bathroom drainage connections placed befor pouring the ground floor slabchiyman
|
|
Ground floor slab reinforcement placed and tied into the ground floor beam steelwork.chiyman
|
|
Ground floor slab formwork almost completed.chiyman
|
|
An evening meal washed down with plenty of Thai whisky at the end of a hard days work.chiyman
|
|
Ground slab formwork completed and ready for the pour. Concrete mixer, sand, stone and cement ready.chiyman
|
|
Ground floor Bathroom waste water pipework placed in position.chiyman
|
|
Toild waste receptical and blue pipe which will discharge water from the shower and wash hand basin.chiyman
|
|
The connection pipe from the toilet to the collection tank.chiyman
|
|
Ground floor slab formwork completed and ready for concrete pour the next day. The bathroom (with the blue pipe sticking out) will be formed at a lower level and cast seperatelychiyman
|
|
Ground floor formwork completedchiyman
|
|
|
|
|
|