Home > User galleries > chiyman > Chiyman's Low Cost House - Part 4 - First Floor Columns and GF blockwork

DSCF5057.JPG
Placing blockwork - note the steel reinforcement placed in the columns and embedded in the cement between each course of block.chiyman
DSCF5058.JPG
First floor columns complete, roof ring beam being constructed from steel.The roof ring beam is commected to the top of the columns by welding to the reinforcement protrouding form the top of the column. An RC beam will also be constructed as a lintel for the large upstairs bedroom window - the formwork for this can be seen. I tried to make sure that safety on site was as good as possible but Thai people have their own way of doing things!! Fortunately he didnt fall off and indeed the whole project has been completed without any accident on site.
chiyman
DSCF5059.JPG
Blokwork wall with bottom window lintel steelwork being placedchiyman
DSCF5060.JPG
Door lintel formwork being put in placechiyman
DSCF5061.JPG
Blockwork wall and bottom window lintel in placechiyman
DSCF5052.JPG
chiyman
DSCF5053.JPG
Columns constructed and window lintel for full height windows in place. The formwork will be removed once the concrete has curedchiyman
DSCF5054.JPG
Formwork for window lintel being constructedchiyman
DSCF5055.JPG
First Floor Columns completed with Formwork removedchiyman
DSCF5056.JPG
Good quality hardwood doorframe squared and supported before blockwork constructionchiyman
DSCF5095r.jpg
Reinforcement being placed for windowchiyman
DSCF5096.JPG
A toolchiyman