Perimeter Wall
|

|


|
|
Walls that are built from concrete blocks are durable and sturdy. An added bonus is that they also help hold in the fill dirt. Fill dirt is often on of the most critical aspects of a house, for if the house is constructed 'too low' -- there is no repair after the fact. With this house we did a partial fill at the beginning to level the land. Then the wall was partially completed, and more fill dirt was brought in the raise the land level another 20 or so centimeters.
The important steps in the process, which are illustrated below are: 1.) Post holes are dug every 2.5 meters. 2.) Support rebar structures are hand made by cutting, bending and wiring together cut rebar metal strands. 3.) These support structures are set in a concrete footing in the post hole. 4.) A large can is used to form the cement up to ground level after the base structure is dry. 5.) A strip footing is created, formed using form wood, which is about 10 inches tall and connects the support rebar structures. 6.) The cement blocks are cemented in place in rows. 7.) A form is made so that a concrete post can be poured around the cement blocks and rebar structure. 8.) Stucco is applied and other decorative options, such as affixing red brick blocks around the entry posts.
One other important note is that during the stage when the blocks are being laid, at the end of each row as piece of rebar is extended into the metal framework. This adds strength when the post is poured.
20 files, last one added on Sep 28, 2011 Album viewed 79 times
|
|
|
|
|
|
|
|

Last additions - Other |

The resulting paving stone walkway. (12-Aug-04)dozerSep 28, 2011
|
|

The paving stones are set in place.dozerSep 28, 2011
|
|

Fine sand is leveled. (31-Jul-04)dozerSep 28, 2011
|
|

The front gutter system. (15-Aug-04)dozerSep 28, 2011
|
|

Random files - Other |

The gate track is laid in position. (15-Jul-04)dozer
|
|

Added the final gutter on top of the patio. (19-Jul-04)dozer
|
|

By using the wrong material to finish of the well, large pockets of air and water form - which put pressure on the sides of the well. Here is the well after the blocks were dug out. The footing will have the rebar supports at 2.5 meter intervals. dozer
|
|

Another shot showing the footing with the rebar supports at 2.5 meter intervals. dozer
|
|

Support metal to be fitted in the cement. (07-Jul-04)dozer
|
|

In the gate is composed of 1 1/2 " square metal frame and vertical 1" square metal bars. The inside circular decorations were bought pre-finished, we use a butterfly and flower design. dozer
|
|

Painted and finished wall section with decorative metal. (15-Aug-04)dozer
|
|

A completed gutter section.dozer
|
|

|
|
|