happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Other

Top rated - Other
DSC05132.jpg
The well after cementing around the base. (19-Aug-04). dozer00000
(0 votes)
DSC05131.jpg
Filtration: A sample of the filtration agent, this being magnesium. Each tank is filled with one mineral filtering agent. (19-Aug-04)

The filtration system consists of three canisters each holding a different filtration agent; carbon, magnesium and an ionizer.
dozer00000
(0 votes)
DSC05128.jpg
dozer00000
(0 votes)
DSC05127.jpg
Water Tank: Diamond is a good brand of tank. This 1600 liter stainless steel tank cost about 10,000 Baht. (19-Aug-04)dozer00000
(0 votes)
DSC05126~0.jpg
Filtration: The canisters are housed in a lockable metal cage. (19-Aug-04)dozer00000
(0 votes)
DSC05097.jpg
Pumps: This is the pump which pumps out of the tank into the house. It is enclosed an a metal cage which is bolted to the ground. (30-Jul-04)

There are two pumps used, one to pump water out of the well, through the filtration system and into the tank, and one to pump water from the tank to the house. Both pumps are Fujika hiiflow GFS-255.

The other pump is in the filtration cage and pumps water from the well to the tank.
dozer00000
(0 votes)
DSC05056~0.jpg
After the water has been pumped out of the well, you can see a large hole in the bottom which needs to be patched. (24-Jan-04) dozer00000
(0 votes)
DSC05053.jpg
One of the finishing steps of a well is placing small stones around the outside of the well. What the well digger had neglected to mention is that he had put large chunks of blocks around the well instead of small stones. This shows the blocks after being dug out . (12-Jul-04) dozer00000
(0 votes)
DSC05052~0.jpg
The well after having stones set around the rings and around the base. dozer00000
(0 votes)
DSC05049.jpg
Now we go about placing stone on the outside of the well rings.dozer00000
(0 votes)
DSC05048.jpg
By using the wrong material to finish of the well, large pockets of air and water form - which put pressure on the sides of the well. Here is the well after the blocks were dug out. The footing will have the rebar supports at 2.5 meter intervals. dozer00000
(0 votes)
DSC05044.jpg
Filtration: The stainless steel filtration canisters are bolted to a cement base. (09-Jul-04)dozer00000
(0 votes)
73 files on 7 page(s) 4

Debug Info 
Debug Output: show / hide