happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Other

Top rated - Other
DSC05123~0.jpg
Metal fencing section. (15-Aug-04)dozer00000
(0 votes)
DSC05119~1.jpg
The gate and metal fencing in place. (13-Aug-04)dozer00000
(0 votes)
DSC05102~0.jpg
The leaf and design details are finished off in an expensive gold paint (from Italy). There are two coats, a specialty yellow primer and then the gold leaf. (31-Jul-04)dozer00000
(0 votes)
DSC05094.jpg
Roller mechanism for the gate. There is one metal roller on the outside and one on the inside of the upside down 'U' piece of metal. (29-Jul-04)dozer00000
(0 votes)
DSC05090.jpg
Fitting a wall piece in place. (26-Jul-04)dozer00000
(0 votes)
DSC05084.jpg
Fitting the gate in place. The metals are painted with a primer first and then painted with a quality oak shade of paint. (23-Jul-04)dozer00000
(0 votes)
DSC05072.jpg
Metal being cut at the same time it is welded by another worker.dozer00000
(0 votes)
DSC05070.jpg
In the gate is composed of 1 1/2 " square metal frame and vertical 1" square metal bars. The inside circular decorations were bought pre-finished, we use a butterfly and flower design. dozer00000
(0 votes)
DSC05069.jpg
The gate track is laid in position. (15-Jul-04)dozer00000
(0 votes)
DSC05128~1.jpg
Valve: The floats control the off/on position within the water tank. (19-Aug-04)dozer00000
(0 votes)
DSC05128~0.jpg
end 5 Minutes Saved, the Story of DIRTY WATER!: Water is such a precious resource. How one short cut which saved the well digger 5 minutes of time could lead to such problems! Oh well, tit (this is Thailand). Now the water is clear as can be seen in this shot. (19-Aug-04) dozer00000
(0 votes)
DSC04019.jpg
Later on the upper part of the well he cemented between the rings to prevent water from flowing in from the sides in the upper portion of the well.dozer00000
(0 votes)
73 files on 7 page(s) 3

Debug Info 
Debug Output: show / hide