happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Other

Top rated - Other
DSC05115.jpg
The resulting paving stone walkway. (12-Aug-04)dozer00000
(0 votes)
DSC05104.jpg
The paving stones are set in place.dozer00000
(0 votes)
DSC05103.jpg
Fine sand is leveled. (31-Jul-04)dozer00000
(0 votes)
DSC05125~1.jpg
The front gutter system. (15-Aug-04)dozer00000
(0 votes)
DSC05121~0.jpg
The rear gutter and down spout.(13-Aug-04)dozer00000
(0 votes)
DSC05080.jpg
Added the final gutter on top of the patio. (19-Jul-04)dozer00000
(0 votes)
DSC05042.jpg
Interconnected gutters. (09-Jul-04)dozer00000
(0 votes)
DSC05037~0.jpg
Brackets.dozer00000
(0 votes)
DSC05036.jpg
A completed gutter section.dozer00000
(0 votes)
DSC05029.jpg
Installing brackets for the 6" gutter sections. (08-Jul-04)dozer00000
(0 votes)
DSC05151~0.jpg
View of planter boxes from patio. (22-Aug-04)dozer00000
(0 votes)
DSC05041.jpg
Nearly completed planter box on the front right of the patio.dozer00000
(0 votes)
73 files on 7 page(s) 1

Debug Info 
Debug Output: show / hide