18 MayTileman 2 is working in front of the master bedroom doorpklongball (0 votes)
18 MayThe tilemen have moved out to the back veranda over the weekend and have most of the floor done now on Mondaypklongball (0 votes)
18 MayMore of the tile application to the back veranda floorpklongball (0 votes)
18 MayANother view of the new tilepklongball (0 votes)
11 MayHere we have Tileman 2 installing the wall tile in the master bath. Tileman 1 is in another spot of the room. The Thai method of tile installing is like nothing I have ever seen before but they get the job done.pklongball (0 votes)
8 MaySome of the many bags of mortar mix being used. The amount of cement and cement products used in one build is staggering.pklongball (0 votes)
8 MayAn over head shot of the small bathroom and the now almost finished wall tiles. We decided today to add one more row on the top to make the ceiling a little higher. Finished height will be 2.75 meters.pklongball (0 votes)
8 MayAnother view of the back stairway to the veranda.pklongball (0 votes)
8 MayThe back stairs are now built and waiting for the finishing touchpklongball (0 votes)
8 MayWe can see here a view of the half walls in the master bathroom. We thought this would be a nice feature to keep most of the water in the shower. Have not decided if a glass door will be bought. Most likely not until after I win the lottery.pklongball (0 votes)
8 MayDelivery man checking the boxes of tilepklongball (0 votes)
8 MayDelivery man checking the boxes of tilepklongball (0 votes)