Mrs PK the "Supervisor"Sunday, Feb 8, 2009 Almost all of the sub-floor precast panels are in place. The builder's order was about 15 panels short. Not a big deal as he can get more quickly to fill the open spaces and get the floor poured this next week then it's on to the roof steel and roofing and the walls.pklongball     (0 votes)
|
|

3 Feb 2009Carrying the panels from the stack to the house floor takes 4 Thai men and some sweat. They only have about 60 more to go.pklongball     (0 votes)
|
|

3 Feb 2009A little push here and a grunt there and the concrete panel gets moved into position. No high tech machines here just plenty of grunt workpklongball     (0 votes)
|
|

3 Feb 2009Moving another panel into positionpklongball     (0 votes)
|
|

3 Feb 2009This is how they do it on my house. Plenty of manual laborpklongball     (0 votes)
|
|

29 Jan. 2009So here we are at the end of day on the 29th. Insect system installed and 10 columns poured along with the delivery of the floor panels. All in all a good week of progress on the Phala House. Stay tuned for more.pklongball     (0 votes)
|
|

29 Jan. 2009Overview of Mr. Termite spraying the ground under the house. This first application of termite chemical will be followed with another using the tubing system just after house completion and then every six months after. The current contract is for 3 years.pklongball     (0 votes)
|
|

29 Jan. 2009Just another view of the final result of the tubing install and some debris that will be removed before the floor goes in placepklongball     (0 votes)
|
|

29 Jan. 2009View just after the install of the tubing. A first application of the chemical was applied using a high pressure sprayer.pklongball     (0 votes)
|
|

29 Jan. 2009The install called for the Termite Team to install 10 zones of tubing. The zones were divided into 4 exit points around the foundation. If these look long , they are intending to be cut to a proper length when the final finish is applied to the wall.pklongball     (0 votes)
|
|

29 Jan. 2009This view shows the newly added black tubing that is part of a termite control system. Installed today.pklongball     (0 votes)
|
|

29 Jan. 2009Overview of the site just after the first delivery of floor panels.pklongball     (0 votes)
|
|
|

|
|
|