Top rated - Phala - "Foundation after the Blessing"
Meter plumbing10 Jan 2009 A small not so deep trench was dug across the road and the connection was made. A hole in the walk was created and the meter installed.pklongball (0 votes)
Meter install almost finished10 Jan 2009 The meter and valves are encased in cement to prevent tampering and stealingpklongball (0 votes)
We have city water10 Jan 2009 The Phala waterman came today and installed our meter. We should have a good supply now for the project.pklongball (0 votes)
Footings and Columns10 Jan 2009 This will be the last photo of open holes. All the footings will be back-filled tomorrow.pklongball (0 votes)
6 Jan 09Another day at the ranchpklongball (0 votes)
Cooling it in the shade6 Jan 09 Almost lunch time----"Come and get it!!"pklongball (0 votes)
Khun PK6 Jan 09 Well this is a fine kettle of fish you got me into!!pklongball (0 votes)
The Ladies Auxillary and Sewing Club6 Jan 09 In this scene the ladies are sitting around drinking tea and passing the time with a little gossip. Mrs. told them she will show the photo to the boss and see what he thinks^^^^^big laugh at this!! In reality it's just before lunch and the pause is due to a lack of gravel to make concrete. The delivery is on the way and the check is in the mail and the crew bus is on the way.pklongball (0 votes)
Day 21 Starting to form the lower column6 Jan 09 Another view of the form workpklongball (0 votes)
Day 21 Starting to form the lower column6 Jan 09 The form work goes on as does the pouring of concrete for the remaining footingspklongball (0 votes)
Day 21 Starting to form the lower columnWell they have just a few of the footings poured and already have started to form around the rebar on the poured footings for the next piece of the puzzle. This piece is the lower part of the column that will reach to ground level and just above.pklongball (0 votes)