|
Top rated - Raise Perimeter Wall Front |
Ribs being Attached to FrameThe lateral support members are wired in place each 20 centimeters. dozer (0 votes)
|
|
|
Form Work and Rebar FrameThe form work is in place for the upper beam to be poured. The rebar frame for the beam is seem on the road. dozer (0 votes)
|
|
ScrapThe part cut off, to be sold for scrap.dozer (0 votes)
|
|
Metal ToppedThe top of the metal was cut off, here it is being smoothed. dozer (0 votes)
|
|
Original Wall with MetalAnother view of the original wall that will be raised. The metal will be topped and a new beam poured on top. dozer (0 votes)
|
|
Original View of Front WallThis is an original view of the front wall. To note the road had just been re-bulldozed, the lower total height of the wall is 75 cm and the top of the metal is at about 1.6 m. dozer (0 votes)
|
|
|
|
|
|
|