happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > CTH Maintenance > Raise Perimeter Wall Front

Top rated - Raise Perimeter Wall Front
IMG_2447.jpg
Ribs being Attached to FrameThe lateral support members are wired in place each 20 centimeters. dozer00000
(0 votes)
IMG_2446.jpg
Formworkdozer00000
(0 votes)
IMG_2444.jpg
Form Work and Rebar FrameThe form work is in place for the upper beam to be poured. The rebar frame for the beam is seem on the road. dozer00000
(0 votes)
IMG_2438.jpg
ScrapThe part cut off, to be sold for scrap.dozer00000
(0 votes)
IMG_2436.jpg
Metal ToppedThe top of the metal was cut off, here it is being smoothed. dozer00000
(0 votes)
DSC05123.jpg
Original Wall with MetalAnother view of the original wall that will be raised. The metal will be topped and a new beam poured on top. dozer00000
(0 votes)
DSC05120.jpg
Original View of Front WallThis is an original view of the front wall. To note the road had just been re-bulldozed, the lower total height of the wall is 75 cm and the top of the metal is at about 1.6 m. dozer00000
(0 votes)
 
19 files on 2 page(s) 2

Debug Info 
Debug Output: show / hide