happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > CTH Maintenance > Raise Perimeter Wall Front

DSC05120.jpg
Original View of Front WallThis is an original view of the front wall. To note the road had just been re-bulldozed, the lower total height of the wall is 75 cm and the top of the metal is at about 1.6 m. dozer
DSC05123.jpg
Original Wall with MetalAnother view of the original wall that will be raised. The metal will be topped and a new beam poured on top. dozer
IMG_2436.jpg
Metal ToppedThe top of the metal was cut off, here it is being smoothed. dozer
IMG_2438.jpg
ScrapThe part cut off, to be sold for scrap.dozer
IMG_2444.jpg
Form Work and Rebar FrameThe form work is in place for the upper beam to be poured. The rebar frame for the beam is seem on the road. dozer
IMG_2446.jpg
Formworkdozer
IMG_2447.jpg
Ribs being Attached to FrameThe lateral support members are wired in place each 20 centimeters. dozer
IMG_2450.jpg
Electric to Extrude through ColumnsThe level of the original electric will be raised since the columns is being extended upwards.dozer
IMG_2451.jpg
Fabricating Security MetalThe security metal will be bolted on top of the finished wall. dozer
IMG_2475.jpg
Edging the Upper BeamAfter the beam has set now it is being cornered. dozer
IMG_2517.jpg
Smoothing the Underside of the Beamdozer
IMG_2518.jpg
Close up of the finished beamdozer
19 files on 2 page(s) 1

Debug Info 
Debug Output: show / hide