Raise Perimeter Wall Front
|
|
|

Original View of Front WallThis is an original view of the front wall. To note the road had just been re-bulldozed, the lower total height of the wall is 75 cm and the top of the metal is at about 1.6 m. dozer
|
|

Original Wall with MetalAnother view of the original wall that will be raised. The metal will be topped and a new beam poured on top. dozer
|
|

Metal ToppedThe top of the metal was cut off, here it is being smoothed. dozer
|
|

ScrapThe part cut off, to be sold for scrap.dozer
|
|

Form Work and Rebar FrameThe form work is in place for the upper beam to be poured. The rebar frame for the beam is seem on the road. dozer
|
|
|

Ribs being Attached to FrameThe lateral support members are wired in place each 20 centimeters. dozer
|
|

Electric to Extrude through ColumnsThe level of the original electric will be raised since the columns is being extended upwards.dozer
|
|

Fabricating Security MetalThe security metal will be bolted on top of the finished wall. dozer
|
|

Edging the Upper BeamAfter the beam has set now it is being cornered. dozer
|
|

Smoothing the Underside of the Beamdozer
|
|

Close up of the finished beamdozer
|
|
|

|
|
|