happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Details > Bathroom

Top rated - Bathroom
DSC03166~0.jpg
Concrete is poured over the hot and cold water pipes. Also note the septic exhaust. (07-Jun-04)dozer00000
(0 votes)
DSC03155.jpg
Large bathroom after cement has just been poured. (05-Jun-04)dozer00000
(0 votes)
DSC03149.jpg
Water runoff pipes run into the septic like this. (05-Jun-04)dozer00000
(0 votes)
DSC03124.jpg
The large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozer00000
(0 votes)
DSC03123.jpg
Large bathroom plumbing layout. On the left is the general water runoff PVC. On the right is the water entry, bathtub exhaust, toilet exhaust and finally the sink exhaust pipe.dozer00000
(0 votes)
DSC03119.jpg
Small bathroom after the cement pour. The 4" PVC on the left is the toilet exhaust and the 3" on the right is the shower stall exhaust. (03-Jun-04)dozer00000
(0 votes)
DSC03114.jpg
The small bathroom being prepared for a cement pour. Sand has been leveled and the wire put in place. The bathroom will be sloped to allow the runoff water to flow to the floor drain.dozer00000
(0 votes)
DSC03112.jpg
Small bathroom water entry for the toilet and bottom washer. The 4" PVC is the toilet exhaust. dozer00000
(0 votes)
DSC03111.jpg
This is the raw plumbing in the small bathroom, shown from the door opening counter clockwise. This shot shows the outside drain pipe (3" standing) along with the 2" sink runoff. The other PVC is the entry of hot and cold water.dozer00000
(0 votes)
DSC03110.jpg
The small bathroom sink plumbing, showing hot and cold water entry and water runoff. dozer00000
(0 votes)
DSC03109.jpg
Small bathroom hot and cold water for the shower stall.dozer00000
(0 votes)
DSC03108.jpg
The hot water is run through copper enclosed in PVC pipe. (02-Jun-04)dozer00000
(0 votes)
44 files on 4 page(s) 3

Debug Info 
Debug Output: show / hide