|
Top rated - Bathroom |
Concrete is poured over the hot and cold water pipes. Also note the septic exhaust. (07-Jun-04)dozer (0 votes)
|
|
Large bathroom after cement has just been poured. (05-Jun-04)dozer (0 votes)
|
|
Water runoff pipes run into the septic like this. (05-Jun-04)dozer (0 votes)
|
|
The large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozer (0 votes)
|
|
Large bathroom plumbing layout. On the left is the general water runoff PVC. On the right is the water entry, bathtub exhaust, toilet exhaust and finally the sink exhaust pipe.dozer (0 votes)
|
|
Small bathroom after the cement pour. The 4" PVC on the left is the toilet exhaust and the 3" on the right is the shower stall exhaust. (03-Jun-04)dozer (0 votes)
|
|
The small bathroom being prepared for a cement pour. Sand has been leveled and the wire put in place. The bathroom will be sloped to allow the runoff water to flow to the floor drain.dozer (0 votes)
|
|
Small bathroom water entry for the toilet and bottom washer. The 4" PVC is the toilet exhaust. dozer (0 votes)
|
|
This is the raw plumbing in the small bathroom, shown from the door opening counter clockwise. This shot shows the outside drain pipe (3" standing) along with the 2" sink runoff. The other PVC is the entry of hot and cold water.dozer (0 votes)
|
|
The small bathroom sink plumbing, showing hot and cold water entry and water runoff. dozer (0 votes)
|
|
Small bathroom hot and cold water for the shower stall.dozer (0 votes)
|
|
The hot water is run through copper enclosed in PVC pipe. (02-Jun-04)dozer (0 votes)
|
|
44 files on 4 page(s) |
|
3 |
|
|
|
|