The framed small bathroom. (13-Mar-04)dozer
|
|
The small bathroom with 4" PVC for the toilet.dozer
|
|
A septic being dug. (22-Apr-04)dozer
|
|
This shows the toilet septic for the small bathroom. In all there are 4 septic tanks, 2 for water runoff and 2 for toilets. There are 5 cement rings used for each one, the standard being 4. Each ring is 1.2 meters in diameter.dozer
|
|
The row of septics is dug behind the house. There are two groups of pairs of septics. From this side the sequence would be toilet, water runoff, water runoff, toilet. dozer
|
|
Here is a cement ring is being put in place in one of the septics. (23-Apr-04)dozer
|
|
The 4" PVC is run into the toilet septic. The mallet is used to create the opening in the cement ring. (31-May-04)dozer
|
|
The PVC drainage from the small bathroom for the water runoff. There are 3 exhaust pipes used for each bathroom. One is for the bathtub (or shower stall), one is for the sink and one is for the outside drain. The pipes are secured in place with a heavy cement. (01-Jun-04)dozer
|
|
The hot water is run through copper enclosed in PVC pipe. (02-Jun-04)dozer
|
|
Small bathroom hot and cold water for the shower stall.dozer
|
|
The small bathroom sink plumbing, showing hot and cold water entry and water runoff. dozer
|
|
This is the raw plumbing in the small bathroom, shown from the door opening counter clockwise. This shot shows the outside drain pipe (3" standing) along with the 2" sink runoff. The other PVC is the entry of hot and cold water.dozer
|
|