happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > chiyman > Chiyman's Low Cost House - part 1 - substructure and ground beams

Top rated - Chiyman's Low Cost House - part 1 - substructure and ground beams
DSCF4912.JPG
Footings poured and concrete pipes cropped to the correct level for further constuction and attachment of the ground beams. This method saved a lot of time.chiyman00000
(0 votes)
DSCF4913.JPG
Ditto previos photographchiyman00000
(0 votes)
DSCF4914.JPG
Backfilling the footings the next daychiyman00000
(0 votes)
DSCF4915.JPG
Backfilling and cutting trench for the ground beams.chiyman00000
(0 votes)
DSCF4906.JPG
Getting everything straight and levelled before the big concrete pour.chiyman00000
(0 votes)
DSCF4907.JPG
Getting everything straight and levelled before the big concrete pour.chiyman00000
(0 votes)
DSCF4908.JPG
First of 3 Concrete truck arrives. Pour direct to the footing and also filling the concrete pipes which form the below ground section of the main building columns.chiyman00000
(0 votes)
DSCF4909.JPG
A happy constructor with a Pepsi!chiyman00000
(0 votes)
DSCF4910.JPG
Lunch Breakchiyman00000
(0 votes)
DSCF4899_resize.jpg
Another view of the footings before the concrete pour.chiyman00000
(0 votes)
DSCF4900.JPG
Clearing the way for the Concrete truck. (The chaps who had dug the holes had left the soil right by the edges of the holes).chiyman00000
(0 votes)
DSCF4901.JPG
Clearing the way for the Concrete truck. Next stage construction materials in the foregroundchiyman00000
(0 votes)
42 files on 4 page(s) 3

Debug Info 
Debug Output: show / hide