happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > Max&Bee-in-CM > Main House - Foundations, Beams, Columns

Top rated - Main House - Foundations, Beams, Columns
IMG_3868.JPG
Bending rebarAll done by handMax&Bee-in-CM00000
(0 votes)
IMG_3869.JPG
Many more to goRebar bent into shape and ready to assemble into the footing Max&Bee-in-CM00000
(0 votes)
IMG_3871.JPG
Tieing together the support cageThis little fella has been going at it all dayMax&Bee-in-CM00000
(0 votes)
IMG_3980.JPG
Rocks under rebarThese rocks are put under the rebar cagesMax&Bee-in-CM00000
(0 votes)
IMG_3849.JPG
Wire ties on footings rebarUsing wore ties to attach the footing rebar together.Max&Bee-in-CM00000
(0 votes)
IMG_3852.JPG
Tools of the tradeMetal cutter, cost 5000 bahtMax&Bee-in-CM00000
(0 votes)
IMG_3738.JPG
Moving dirt aroundThe macro truck dumps the dirt near the sides, it will be used later to fill the holes in.Max&Bee-in-CM00000
(0 votes)
IMG_3791.JPG
Column rebarMaking the internal rebar for the columnsMax&Bee-in-CM00000
(0 votes)
IMG_3793.JPG
Lots of rebarAlot of work to get through...Max&Bee-in-CM00000
(0 votes)
IMG_3802.JPG
Foundation holesQuite deep, the main holes are 2 m deepMax&Bee-in-CM00000
(0 votes)
IMG_3715.JPG
Water zoneThe water pump area has been setup, with the smurf installed 60 metre below ground,
and some pipes and container.
Max&Bee-in-CM00000
(0 votes)
IMG_3719.JPG
Switch for the SmurfA simple switch is setup for the smurf (submersible pump).Max&Bee-in-CM00000
(0 votes)
164 files on 14 page(s) 13

Debug Info 
Debug Output: show / hide