happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > Max&Bee-in-CM > Main House - Foundations, Beams, Columns

Top rated - Main House - Foundations, Beams, Columns
IMG_3373.JPG
the builder checks the plansusing the hood of the car as a tableMax&Bee-in-CM55555
(6 votes)
IMG_3360.JPG
ready to measuretaking the first stepsMax&Bee-in-CM55555
(3 votes)
IMG_3723.JPG
Toilet installed and ready for actionMax&Bee-in-CM55555
(2 votes)
IMG_5394.JPG
Columns by sunsetMax&Bee-in-CM55555
(1 votes)
IMG_4503.JPG
Concrete floor for the bathroomThey put down some concrete to give a better floor for the outdoor bathroom. Fresh water is pumped up from 60 metres.Max&Bee-in-CM55555
(1 votes)
IMG_4379.JPG
Measure land infill heightUsing a water tube, the height of the soil infill is measured. It should be 50 cm, but it was found to vary between 25 and 40 cm. Hence the soil man was told to fill to the agreed level of 50 cm, and not beat around the bush, by saying the land is uneven in places. Payment is being withheld until 50 cm is achieved on the whole land.

The agreement was verbal - next time everything will be in writing - lesson learnt - don't trust anyone.
Max&Bee-in-CM55555
(1 votes)
IMG_4262.JPG
Surpervising the projectWe are at site daily to supervise the work.Max&Bee-in-CM55555
(1 votes)
IMG_3809.JPG
Bending the rebarThe lady bends the rebar while her 2 daughters look on.Max&Bee-in-CM55555
(1 votes)
IMG_3848.JPG
Efficient workerOur best worker on site, small but really really fast.Max&Bee-in-CM55555
(1 votes)
IMG_3851.JPG
Footing rebarFooting rebar preparedMax&Bee-in-CM55555
(1 votes)
IMG_3742.JPG
Digging foundation holesThe macro man hard at work.Max&Bee-in-CM55555
(1 votes)
IMG_3538.JPG
check the layoutcheck, double check and triple check the layoutMax&Bee-in-CM55555
(1 votes)
164 files on 14 page(s) 1

Debug Info 
Debug Output: show / hide