|
Most viewed - Other |
18 viewsThe resulting paving stone walkway. (12-Aug-04)dozer
|
|
17 viewsAnother shot showing the footing with the rebar supports at 2.5 meter intervals. dozer
|
|
17 viewsLaying a brick in place.dozer
|
|
17 viewsFinishing touches applied to the top of the perimeter wall foundation post.dozer
|
|
17 viewsThe top of the fence and gate is finished with security arrows.dozer
|
|
17 viewsDetail section of the metal fencing.dozer
|
|
17 viewsAnother view of the gate anchor.dozer
|
|
17 viewsThis is the neighbor's gate and metal fencing, whose design we generally copied. (19-Apr-04)dozer
|
|
16 viewsTo add strength the blocks are cemented in place prior to pouring the supporting posts. The posts will be poured 'around' the blocks. Standard sizes for facing walls is 4 blocks high, the back sides are 7 blocks high. (24-Jan-04) dozer
|
|
16 viewsA wall section (front and side) with completed support post structures. dozer
|
|
16 viewsMetal being cut at the same time it is welded by another worker.dozer
|
|
16 viewsLaying a row of bricks. (08-Jul-04)dozer
|
|
|
|
|
|