1 April171 viewsThe look of the tile just about sundown with the edges now almost finishedpklongball
4 April159 viewsAnd from the back right corner we can see gables that need finishing and the master bedroom door opening and the back verandapklongball
4 April156 viewsFrom the left front view we can see the roof gable is the next finish that needs to be done.pklongball
15 April148 viewsLeft front side view. The front entry gable is built and the right side is today and the left side soon.pklongball
4 April144 viewsFrom the right front corner we can see a hip area that needs the cap tiles and this will just about complete the tile work. A few more in the areas close to the bottom of the two big gables and then the gable work and the roof will be finished.pklongball
4 April141 viewsAnd now the back left corner view showing us the long roof valley that was done very well in my opinion. The tile fitter spent a lot of time cutting the tile to get a good tight, straight line down this valley.pklongball
15 April141 viewsThis is the last day of Songkran and we actually have 6 or 7 workers on site. Three of them are now adding the wood work to the gables and in this view the vents are being built.pklongball
4 April139 viewsThis shot of one of the valley areas of the roof. Nice job on all the valleys and I would have expected this as I have seen this man's work on other builds my builder has donepklongball
15 April123 viewsLonger view of the look of the now finished tile and the gable work is starting to get completedpklongball