Most viewed - Phala - "The Floor comes next" |

Mrs PK the "Supervisor"231 viewsSunday, Feb 8, 2009 Almost all of the sub-floor precast panels are in place. The builder's order was about 15 panels short. Not a big deal as he can get more quickly to fill the open spaces and get the floor poured this next week then it's on to the roof steel and roofing and the walls.pklongball
|
|

29 Jan. 2009217 viewsThis view shows the floor panels near the back of the house and the crew busy filling the first 10 of the columns.pklongball
|
|

29 Jan. 2009213 viewsJust another view of the final result of the tubing install and some debris that will be removed before the floor goes in placepklongball
|
|

29 Jan. 2009206 viewsOverview of Mr. Termite spraying the ground under the house. This first application of termite chemical will be followed with another using the tubing system just after house completion and then every six months after. The current contract is for 3 years.pklongball
|
|

29 Jan. 2009204 viewsThe floor panels were delivered today. We have 3 different lengths to span the areas needed.pklongball
|
|

29 Jan. 2009204 viewsThe install called for the Termite Team to install 10 zones of tubing. The zones were divided into 4 exit points around the foundation. If these look long , they are intending to be cut to a proper length when the final finish is applied to the wall.pklongball
|
|

3 Feb 2009204 viewsSome of the floor panels are now in place in the back area of the house.pklongball
|
|

29 Jan. 2009203 viewsView just after the install of the tubing. A first application of the chemical was applied using a high pressure sprayer.pklongball
|
|

29 Jan. 2009199 viewsSo here we are at the end of day on the 29th. Insect system installed and 10 columns poured along with the delivery of the floor panels. All in all a good week of progress on the Phala House. Stay tuned for more.pklongball
|
|

29 Jan. 2009198 viewsThis view shows the newly added black tubing that is part of a termite control system. Installed today.pklongball
|
|

Valentine's Day 2009188 viewsSo we now have a poured floor and this brings an end to this phase of the build. Next week brings the beginning of the roof steel work and maybe morepklongball
|
|

3 Feb 2009187 viewsMoving another panel into positionpklongball
|
|
|

|
|
|