happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > CTH Maintenance > Raise Perimeter Wall Front

Most viewed - Raise Perimeter Wall Front
IMG_2518.jpg
Close up of the finished beam24 viewsdozer
IMG_2534.jpg
Columns are Raised23 viewsThe Columns on either side of the Entry door and drive way gate are raised to match the neve level of the wall. Electric conduit extends through the top and has been taped. dozer
IMG_2548p-1.jpg
Topped Beam Decorative Pattern Finished22 viewsThe top beam has had the corners rendered in a pattern matching the bottom part of the column.dozer
DSC05120.jpg
Original View of Front Wall21 viewsThis is an original view of the front wall. To note the road had just been re-bulldozed, the lower total height of the wall is 75 cm and the top of the metal is at about 1.6 m. dozer
IMG_2547.jpg
Another Column21 viewsElectric conduit extends through the top and has been taped. Note the new bricks used to top up the column are the nice decorative ones (3.5 b each) which look much nicer than the ones on the bottom. dozer
DSC05123.jpg
Original Wall with Metal19 viewsAnother view of the original wall that will be raised. The metal will be topped and a new beam poured on top. dozer
IMG_2436.jpg
Metal Topped19 viewsThe top of the metal was cut off, here it is being smoothed. dozer
 
19 files on 2 page(s) 2

Debug Info 
Debug Output: show / hide