|
Most viewed - Raise Perimeter Wall Front |
Close up of the finished beam24 viewsdozer
|
|
Columns are Raised23 viewsThe Columns on either side of the Entry door and drive way gate are raised to match the neve level of the wall. Electric conduit extends through the top and has been taped. dozer
|
|
Topped Beam Decorative Pattern Finished22 viewsThe top beam has had the corners rendered in a pattern matching the bottom part of the column.dozer
|
|
Original View of Front Wall21 viewsThis is an original view of the front wall. To note the road had just been re-bulldozed, the lower total height of the wall is 75 cm and the top of the metal is at about 1.6 m. dozer
|
|
Another Column21 viewsElectric conduit extends through the top and has been taped. Note the new bricks used to top up the column are the nice decorative ones (3.5 b each) which look much nicer than the ones on the bottom. dozer
|
|
Original Wall with Metal19 viewsAnother view of the original wall that will be raised. The metal will be topped and a new beam poured on top. dozer
|
|
Metal Topped19 viewsThe top of the metal was cut off, here it is being smoothed. dozer
|
|
|
|
|
|
|