happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > CTH Maintenance > Raise Perimeter Wall Front

Most viewed - Raise Perimeter Wall Front
IMG_2475.jpg
Edging the Upper Beam33 viewsAfter the beam has set now it is being cornered. dozer
IMG_2811.jpg
Painting Decorative Metal32 viewsThis is a shot of partially painted decorative metal. We had a couple of day laborers paint the metal and they actually did a good job. First the old metal was sanded and prepped and my favorite metal paint Glipton TOA 465 was applied. dozer
IMG_2450.jpg
Electric to Extrude through Columns29 viewsThe level of the original electric will be raised since the columns is being extended upwards.dozer
IMG_2446.jpg
Formwork27 viewsdozer
IMG_2451.jpg
Fabricating Security Metal27 viewsThe security metal will be bolted on top of the finished wall. dozer
IMG_2447.jpg
Ribs being Attached to Frame26 viewsThe lateral support members are wired in place each 20 centimeters. dozer
IMG_2517.jpg
Smoothing the Underside of the Beam26 viewsdozer
IMG_2594.jpg
Security Metal affixed to Top of Wall26 viewsThis security metal was fabricated here and then attached via anchor bolts. dozer
IMG_2597.jpg
Welding Security Metal26 viewsMost of the welding was done prior to putting each section in place (each section being more than 2 meters). Here two adjacent sections are being welded together. dozer
IMG_2567.jpg
Column Lighting25 viewsElectrician preparing to install the lighting on the top of each column. dozer
IMG_2438.jpg
Scrap24 viewsThe part cut off, to be sold for scrap.dozer
IMG_2444.jpg
Form Work and Rebar Frame24 viewsThe form work is in place for the upper beam to be poured. The rebar frame for the beam is seem on the road. dozer