IMG_4779.jpg
Perimeter Wall Openings102 viewsThe perimeter wall decorative openings as per the plan. These have light fixtures int he top of the opening for a nice touch in the evenings.dozer
IMG_4550.jpg
Terrazzo Counter Troweling101 viewsThe dry concrete mix (with added natural pigment for coloration) is hand troweled into place. This requires experienced guys who know how to add just enough water (which is sprinkled on top of the dry concrete mix so it can be worked) and apply pressure to work out the air bubbles.dozer
IMG_4916.jpg
A/C Installation101 viewsThe A/C unit during installation. Note the electrics are not surface mounted (the are in the wall as with other fixtures) and on the outside the main compressor is wall mounted so as not to take up any ground space and minimize the connection distance. This is a 13000 BTU unit which can cool the master bedroom + great room.dozer
IMG_4374.jpg
Poured Archway100 viewsA side image of the poured archway. The concrete is poured within a wood framework and supported by wood slats which extend to the ground.dozer
IMG_4557.jpg
Exterior Walkway Tiling100 viewsThis shows rebar strips being pressed into the newly poured exterior concrete surface to make a faux tile finish. The rebar strips are used after the concrete has had time to 'set up' so that the impression can be made by pressing the rebar frame into the concrete.dozer
IMG_4660.jpg
Drive Way Columns100 viewsThe front columns are to be poured within the decorative red bricks, which will act as forms. These bricks differ from the standard red brick in there size and the fact that they don't have holes in them.dozer
IMG_4578.jpg
Terracotta Tiles Being Laid99 viewsTerracotta takes more care to lay than regular tiles. Due to the way the tiles are produced, they are not all the same size, much like grade C tiles -- therefore, extra care must be taken to make sure they come out looking straight in the given pattern. The tiles are pre dipped in a liquid silicone derivative so they can't degenerate with moisture. dozer
IMG_4527.jpg
Applying 2" Composite Sheeting on Soffit99 viewsThe soffit is finished with 2" Shera brand composite sheeting. These are nice and functional, but more expensive than flat composite GRC sheeting. dozer
IMG_4506.jpg
Tile Spacers99 viewsSpacers being used laying the floor tiles to maintain a consistent spacing. dozer
IMG_4619.jpg
Soffit Installation98 viewsInstalling the 2" shera board in up to the corner joint.dozer
IMG_4697.jpg
Taped Exhaust Vent98 viewsThe taped exhaust vent mounted in the soffit underside prior to the detail paint application. One thing that must be minimized with masking tape is the amount of time it is affixed to the masked surface, after time it tends to leave a hard to remove glue residuedozer
IMG_4891.jpg
Front Driveway Pour98 viewsThe front driveway pour. dozer