Home > User galleries > chiyman > Chiyman's Low Cost House - Part 2 - Ground slab and ground to first floor cloumns

Most viewed - Chiyman's Low Cost House - Part 2 - Ground slab and ground to first floor cloumns
DSCF4970.JPG
Everything ready for pouring the Ground floor slab41 viewschiyman
DSCF4993.JPG
Washroom - A bit cold for me!!40 viewschiyman
DSCF4997.JPG
Formwork for the Ground floor columns being removed40 viewschiyman
DSCF4984.JPG
Pouring Conccrete into the columns38 viewsThis is another entirely manual process whereby concrete is mixed in the concrete mixer by hand as described previously and then delivered by wheelbarrow before being lifted in small buckets passed hand to hand to the guy standing on the platfom who then tips it into the column formwork. This was an all day job to complete the 18 columns. Concrete volume circa 2.25 cubic meters.chiyman
DSCF4992.JPG
Piles of Sand and stone for concrete mixing38 viewsI should have insisted that a wooden structure be constructed to hold the sand and stone as just dumping it on the ground and using it caused a lot of wastage and required a big clean up later on. chiyman
DSCF4978.JPG
A delivery of Yucca poles freshly cut which will be used later for the first floor construction37 viewschiyman
DSCF4961.JPG
The waste from the downstairs toilet will be collected in this tank formed from precast concrete rings - this one is 4 rings deep.37 viewschiyman
DSCF4995.JPG
A beautiful sunset after a hard days work.36 viewschiyman
DSCF4987.JPG
Concrete poured i and waiting for it to cure before removal of the forms.35 viewschiyman
DSCF4989.JPG
Still waiting for concrete to cure!32 viewschiyman
   