Ground floor Bathroom waste water pipework placed in position.57 viewschiyman
Completed Ground slab brushed finish ready to accept floor tiling later on54 viewschiyman
Note the reinfocement for the ground floor slab (mesh) was tied onto the ground beam reinforcement for extra strength.54 viewschiyman
The connection pipe from the toilet to the collection tank.52 viewschiyman
Ground floor slab reinforcement placed and tied into the ground floor beam steelwork.52 viewschiyman
I was very pleased with the quality of the columns - much better than I had anticipated51 viewschiyman
Ground floor slab formwork completed and ready for concrete pour the next day. The bathroom (with the blue pipe sticking out) will be formed at a lower level and cast seperately51 viewschiyman
Formwork for the ground floor columns being removed49 viewschiyman
Ground floor slab completed. starting to build the formwork for the Ground floor to first floor columns49 viewschiyman