happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > chiyman > Chiyman's Low Cost House - Part 2 - Ground slab and ground to first floor cloumns

Most viewed - Chiyman's Low Cost House - Part 2 - Ground slab and ground to first floor cloumns
DSCF4951.JPG
Bathroom drainage connections placed befor pouring the ground floor slab60 viewschiyman
DSCF4958.JPG
Ground floor Bathroom waste water pipework placed in position.57 viewschiyman
DSCF4973.JPG
Completed Ground slab brushed finish ready to accept floor tiling later on54 viewschiyman
DSCF4969.JPG
Note the reinfocement for the ground floor slab (mesh) was tied onto the ground beam reinforcement for extra strength.54 viewschiyman
DSCF4960.JPG
The connection pipe from the toilet to the collection tank.52 viewschiyman
DSCF4952.JPG
Ground floor slab reinforcement placed and tied into the ground floor beam steelwork.52 viewschiyman
DSCF4998.JPG
I was very pleased with the quality of the columns - much better than I had anticipated51 viewschiyman
DSCF4962.JPG
Ground floor slab formwork completed and ready for concrete pour the next day. The bathroom (with the blue pipe sticking out) will be formed at a lower level and cast seperately51 viewschiyman
DSCF4996.JPG
Formwork for the ground floor columns being removed49 viewschiyman
DSCF4974.JPG
Ground floor slab completed. starting to build the formwork for the Ground floor to first floor columns49 viewschiyman
DSCF4964.JPG
Ground floor formwork completed47 viewschiyman
DSCF4959.JPG
Toild waste receptical and blue pipe which will discharge water from the shower and wash hand basin.47 viewschiyman
34 files on 3 page(s) 1

Debug Info 
Debug Output: show / hide