Most viewed - Main House - Foundations, Beams, Columns |

Levelling the concrete85 viewsThe worker directing the concrete pour and leveling the concrete.Max&Bee-in-CM
|
|

Metal shuttering85 viewsWe rented metal shuttering for the columns. Cost = 3,650 baht for a few weeks.Max&Bee-in-CM
|
|

Laundry85 viewsThe rebar for the ground beams of the laundryMax&Bee-in-CM
|
|

Master bedroom85 viewsThe rebar ground beams for the master bedroom on the left, looking at the front of the house.Max&Bee-in-CM
|
|

Toilet, bathroom and bedroom85 viewsLooking at the toilet in the front of the picture, the bathroom on the right, and the small bedroom next to it on the left.Max&Bee-in-CM
|
|

Formwork complete85 viewsLooking at the middle rear of the houseMax&Bee-in-CM
|
|
|

Laying out the house on the land84 viewsthe yellow soil in contrast to the rice fieldMax&Bee-in-CM
|
|

Work bench84 viewsVery functional, and looks great too. made from all natural materials.Max&Bee-in-CM
|
|

Concrete foundation84 viewsConcrete poured for foundations and being setMax&Bee-in-CM
|
|

Concrete foundation84 viewsColumn rebar set inside the concrete pourMax&Bee-in-CM
|
|
|