|

Most viewed - Main House - Foundations, Beams, Columns |

Pouring concrete90 viewsIt comes fast out of the truckMax&Bee-in-CM
|
|

Water zone89 viewsThe water pump area has been setup, with the smurf installed 60 metre below ground,
and some pipes and container. Max&Bee-in-CM
|
|

Tieing together the support cage89 viewsThis little fella has been going at it all dayMax&Bee-in-CM
|
|

Ready to install rebar89 viewsMeasured out the exact position with the builders line, in preparation for rebar column install.Max&Bee-in-CM
|
|

Busy ladies89 viewsThe ladies are busy carrying materials.Max&Bee-in-CM
|
|

Making stakes89 viewsSharpening the stakes - not for vampire hunting, but for supporting the formwork in place.Max&Bee-in-CM
|
|

First beam mold89 viewsThe first beam form-mold they installed.Max&Bee-in-CM
|
|
|

Inside the rebar column88 viewsLooking down inside the rebar and the concrete column.Max&Bee-in-CM
|
|

View from the entrance corridor88 viewsStanding just inside the entrance, on the left is the master bedroom.Max&Bee-in-CM
|
|
|

Footing rebar87 viewsAlot of rebar made in a few days by 3 or 4 people, impressive.Max&Bee-in-CM
|
|
164 files on 14 page(s) |
 |
 |
 |
 |
6 |  |
 |
 |
 |
 |
|

|
|
|