happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > Max&Bee-in-CM > Main House - Foundations, Beams, Columns

Most viewed - Main House - Foundations, Beams, Columns
IMG_4262.JPG
Surpervising the project203 viewsWe are at site daily to supervise the work.Max&Bee-in-CM
IMG_3851.JPG
Footing rebar156 viewsFooting rebar preparedMax&Bee-in-CM
IMG_3360.JPG
ready to measure153 viewstaking the first stepsMax&Bee-in-CM
IMG_3723.JPG
Toilet installed and ready for action153 viewsMax&Bee-in-CM
IMG_4503.JPG
Concrete floor for the bathroom153 viewsThey put down some concrete to give a better floor for the outdoor bathroom. Fresh water is pumped up from 60 metres.Max&Bee-in-CM
IMG_3373.JPG
the builder checks the plans151 viewsusing the hood of the car as a tableMax&Bee-in-CM
IMG_3538.JPG
check the layout145 viewscheck, double check and triple check the layoutMax&Bee-in-CM
IMG_3742.JPG
Digging foundation holes145 viewsThe macro man hard at work.Max&Bee-in-CM
IMG_3848.JPG
Efficient worker140 viewsOur best worker on site, small but really really fast.Max&Bee-in-CM
IMG_4379.JPG
Measure land infill height132 viewsUsing a water tube, the height of the soil infill is measured. It should be 50 cm, but it was found to vary between 25 and 40 cm. Hence the soil man was told to fill to the agreed level of 50 cm, and not beat around the bush, by saying the land is uneven in places. Payment is being withheld until 50 cm is achieved on the whole land.

The agreement was verbal - next time everything will be in writing - lesson learnt - don't trust anyone.
Max&Bee-in-CM
IMG_5039.JPG
Right angle rebar131 viewsCloseup of the rebar work for the right corner of the house, the study room.Max&Bee-in-CM
IMG_3809.JPG
Bending the rebar130 viewsThe lady bends the rebar while her 2 daughters look on.Max&Bee-in-CM
164 files on 14 page(s) 1

Debug Info 
Debug Output: show / hide