happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Other

Last additions - Other
DSC05123~0.jpg
Metal fencing section. (15-Aug-04)dozerSep 28, 2011
DSC05119~1.jpg
The gate and metal fencing in place. (13-Aug-04)dozerSep 28, 2011
DSC05102~0.jpg
The leaf and design details are finished off in an expensive gold paint (from Italy). There are two coats, a specialty yellow primer and then the gold leaf. (31-Jul-04)dozerSep 28, 2011
DSC05094.jpg
Roller mechanism for the gate. There is one metal roller on the outside and one on the inside of the upside down 'U' piece of metal. (29-Jul-04)dozerSep 28, 2011
DSC05090.jpg
Fitting a wall piece in place. (26-Jul-04)dozerSep 28, 2011
DSC05084.jpg
Fitting the gate in place. The metals are painted with a primer first and then painted with a quality oak shade of paint. (23-Jul-04)dozerSep 28, 2011
DSC05072.jpg
Metal being cut at the same time it is welded by another worker.dozerSep 28, 2011
DSC05070.jpg
In the gate is composed of 1 1/2 " square metal frame and vertical 1" square metal bars. The inside circular decorations were bought pre-finished, we use a butterfly and flower design. dozerSep 28, 2011
DSC05069.jpg
The gate track is laid in position. (15-Jul-04)dozerSep 28, 2011
DSC05128~1.jpg
Valve: The floats control the off/on position within the water tank. (19-Aug-04)dozerSep 28, 2011
DSC05128~0.jpg
end 5 Minutes Saved, the Story of DIRTY WATER!: Water is such a precious resource. How one short cut which saved the well digger 5 minutes of time could lead to such problems! Oh well, tit (this is Thailand). Now the water is clear as can be seen in this shot. (19-Aug-04) dozerSep 28, 2011
DSC04019.jpg
Later on the upper part of the well he cemented between the rings to prevent water from flowing in from the sides in the upper portion of the well.dozerSep 28, 2011
73 files on 7 page(s) 3

Debug Info 
Debug Output: show / hide