|
Last additions - Other |
Metal fencing section. (15-Aug-04)dozerSep 28, 2011
|
|
The gate and metal fencing in place. (13-Aug-04)dozerSep 28, 2011
|
|
The leaf and design details are finished off in an expensive gold paint (from Italy). There are two coats, a specialty yellow primer and then the gold leaf. (31-Jul-04)dozerSep 28, 2011
|
|
Roller mechanism for the gate. There is one metal roller on the outside and one on the inside of the upside down 'U' piece of metal. (29-Jul-04)dozerSep 28, 2011
|
|
Fitting a wall piece in place. (26-Jul-04)dozerSep 28, 2011
|
|
Fitting the gate in place. The metals are painted with a primer first and then painted with a quality oak shade of paint. (23-Jul-04)dozerSep 28, 2011
|
|
Metal being cut at the same time it is welded by another worker.dozerSep 28, 2011
|
|
In the gate is composed of 1 1/2 " square metal frame and vertical 1" square metal bars. The inside circular decorations were bought pre-finished, we use a butterfly and flower design. dozerSep 28, 2011
|
|
The gate track is laid in position. (15-Jul-04)dozerSep 28, 2011
|
|
Valve: The floats control the off/on position within the water tank. (19-Aug-04)dozerSep 28, 2011
|
|
end 5 Minutes Saved, the Story of DIRTY WATER!: Water is such a precious resource. How one short cut which saved the well digger 5 minutes of time could lead to such problems! Oh well, tit (this is Thailand). Now the water is clear as can be seen in this shot. (19-Aug-04) dozerSep 28, 2011
|
|
Later on the upper part of the well he cemented between the rings to prevent water from flowing in from the sides in the upper portion of the well.dozerSep 28, 2011
|
|
|
|
|
|