The resulting paving stone walkway. (12-Aug-04)dozerSep 28, 2011
|
|

The paving stones are set in place.dozerSep 28, 2011
|
|

Fine sand is leveled. (31-Jul-04)dozerSep 28, 2011
|
|

The front gutter system. (15-Aug-04)dozerSep 28, 2011
|
|

The rear gutter and down spout.(13-Aug-04)dozerSep 28, 2011
|
|

Added the final gutter on top of the patio. (19-Jul-04)dozerSep 28, 2011
|
|

Interconnected gutters. (09-Jul-04)dozerSep 28, 2011
|
|

Brackets.dozerSep 28, 2011
|
|

A completed gutter section.dozerSep 28, 2011
|
|

Installing brackets for the 6" gutter sections. (08-Jul-04)dozerSep 28, 2011
|
|

View of planter boxes from patio. (22-Aug-04)dozerSep 28, 2011
|
|

Nearly completed planter box on the front right of the patio.dozerSep 28, 2011
|
|
|

|
|
|