happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Other > Perimeter Wall

Last additions - Perimeter Wall
DSC00033.jpg
Another shot showing the footing with the rebar supports at 2.5 meter intervals. dozerSep 28, 2011
DSC00032.jpg
The footing will have the rebar supports at 2.5 meter intervals. dozerSep 28, 2011
DSC00031.jpg
A footing is created about 10 inches high by about 10 cm. wide. Straight form wood is used to form the concrete. The concrete is poured around a metal rebar structure, of 3 hun full (vertical) with 2 hun full (cross supports). (16-Jan-04) dozerSep 28, 2011
DSC00029.jpg
Cement is poured using a large metal can as a form, about 30 cm square. (13-Jan-04) dozerSep 28, 2011
DSC00023.jpg
The base is cemented in place with a cement pour around 30 cm thick. dozerSep 28, 2011
DSC00022.jpg
The wide area show here will be for the entry gate. dozerSep 28, 2011
DSC00021.jpg
Supporting rebar structures, which are made by tying metal strands together are placed in the completed post hole. There is a metal base on the bottom of the structure. The metal used on the upright pieces is guage 3 hun full, the square supports are 2 hun full. dozerSep 28, 2011
DSC00020.jpg
Post holes like this are dug each 2.5 meters. The stick at the bottom signifies the center of the fence post to be poured. The hole is 60 cm square, 60 cm deep. (11-Jan-04) dozerSep 28, 2011
20 files on 2 page(s) 2

Debug Info 
Debug Output: show / hide