|
Last additions - Bathroom |
The PVC drainage from the small bathroom for the water runoff. There are 3 exhaust pipes used for each bathroom. One is for the bathtub (or shower stall), one is for the sink and one is for the outside drain. The pipes are secured in place with a heavy cement. (01-Jun-04)dozerSep 28, 2011
|
|
The 4" PVC is run into the toilet septic. The mallet is used to create the opening in the cement ring. (31-May-04)dozerSep 28, 2011
|
|
Here is a cement ring is being put in place in one of the septics. (23-Apr-04)dozerSep 28, 2011
|
|
The row of septics is dug behind the house. There are two groups of pairs of septics. From this side the sequence would be toilet, water runoff, water runoff, toilet. dozerSep 28, 2011
|
|
This shows the toilet septic for the small bathroom. In all there are 4 septic tanks, 2 for water runoff and 2 for toilets. There are 5 cement rings used for each one, the standard being 4. Each ring is 1.2 meters in diameter.dozerSep 28, 2011
|
|
A septic being dug. (22-Apr-04)dozerSep 28, 2011
|
|
The small bathroom with 4" PVC for the toilet.dozerSep 28, 2011
|
|
The framed small bathroom. (13-Mar-04)dozerSep 28, 2011
|
|
44 files on 4 page(s) |
|
4 |
|
|
|
|