Last additions - Chiyman's Low Cost House - Part 2 - Ground slab and ground to first floor cloumns |
An evening meal washed down with plenty of Thai whisky at the end of a hard days work.chiymanJan 18, 2011
|
|
Ground floor slab formwork almost completed.chiymanJan 18, 2011
|
|
Ground floor slab reinforcement placed and tied into the ground floor beam steelwork.chiymanJan 18, 2011
|
|
Bathroom drainage connections placed befor pouring the ground floor slabchiymanJan 18, 2011
|
|
The connection pipe from the toilet to the collection tank.chiymanJan 18, 2011
|
|
Toild waste receptical and blue pipe which will discharge water from the shower and wash hand basin.chiymanJan 18, 2011
|
|
Ground floor Bathroom waste water pipework placed in position.chiymanJan 18, 2011
|
|
Ground slab formwork completed and ready for the pour. Concrete mixer, sand, stone and cement ready.chiymanJan 18, 2011
|
|
Ground slab formwork completed and ready for the pourchiymanJan 18, 2011
|
|
Groundfloor formwork completed. Our construction workers lived in the tent which can been seen in the picture. They considered this to be more "professional" than constructing their own temporary accommodation!!chiymanJan 18, 2011
|
|
Ground floor formwork completedchiymanJan 18, 2011
|
|
Ground floor formwork completedchiymanJan 18, 2011
|
|
|
|
|
|