|
Last additions - Chiyman's Low Cost House - part 1 - substructure and ground beams |
Footings poured and concrete pipes cropped to the correct level for further constuction and attachment of the ground beams. This method saved a lot of time.chiymanDec 27, 2010
|
|
Ditto previos photographchiymanDec 27, 2010
|
|
Backfilling the footings the next daychiymanDec 27, 2010
|
|
Backfilling and cutting trench for the ground beams.chiymanDec 27, 2010
|
|
Getting everything straight and levelled before the big concrete pour.chiymanDec 27, 2010
|
|
Getting everything straight and levelled before the big concrete pour.chiymanDec 27, 2010
|
|
First of 3 Concrete truck arrives. Pour direct to the footing and also filling the concrete pipes which form the below ground section of the main building columns.chiymanDec 27, 2010
|
|
A happy constructor with a Pepsi!chiymanDec 27, 2010
|
|
|
Another view of the footings before the concrete pour.chiymanDec 27, 2010
|
|
Clearing the way for the Concrete truck. (The chaps who had dug the holes had left the soil right by the edges of the holes).chiymanDec 27, 2010
|
|
Clearing the way for the Concrete truck. Next stage construction materials in the foregroundchiymanDec 27, 2010
|
|
42 files on 4 page(s) |
|
3 |
|
|
|
|