8 MayAnother view of the back stairway to the veranda.pklongball
8 MayThe back stairs are now built and waiting for the finishing touchpklongball
8 MayAn over head shot of the small bathroom and the now almost finished wall tiles. We decided today to add one more row on the top to make the ceiling a little higher. Finished height will be 2.75 meters.pklongball
8 MaySome of the many bags of mortar mix being used. The amount of cement and cement products used in one build is staggering.pklongball
11 MayHere we have Tileman 2 installing the wall tile in the master bath. Tileman 1 is in another spot of the room. The Thai method of tile installing is like nothing I have ever seen before but they get the job done.pklongball
18 MayThe tilemen have moved out to the back veranda over the weekend and have most of the floor done now on Mondaypklongball
18 MayMore of the tile application to the back veranda floorpklongball