happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > CTH Maintenance > Raise Perimeter Wall Side

DSC05124.jpg
Original WallThe original side wall being raised. dozer
IMG_1301.jpg
Old MetalThe old metal being prepared for the scrap man at 10 b per kilo. dozer
IMG_1302.jpg
RebarIn addition to these lateral rebars which were attached to the existing metal, there were some place by drilling into the existing column. dozer
IMG_1303.jpg
RebarShows how the rebar was affixed laterally and vertically for the modification. dozer
IMG_1304.jpg
Prep WorkThe metal being before to hold the security metal in place (which is anchor bolted to the column) will be used to secure rebar for lateral strength. dozer
IMG_1305.jpg
WeldA weld of new rebar to old rebar. dozer
IMG_1307.jpg
New Cinder BlocksThe new cinder blocks are laid in place. Lateral rebar supports are drilled into the existing column to help hold the cinderblocks in place. dozer
IMG_1314.jpg
Rebar FrameThe original column was chiseled down to the existing rebar and the new frame was welded to it. dozer
IMG_1315.jpg
Column ExtensionThe column extensions were poured around the cinder blocks. dozer
IMG_1317.jpg
Form Work for Upper BeamThe form work for the upper beam is being put in place.dozer
IMG_1406.jpg
Finished ViewClose up of the top beam edging. This group did good detailed work.dozer
 