Home > Renovations and Maintenance > CTH Maintenance > Raise Perimeter Wall Front

IMG_2534.jpg
Columns are RaisedThe Columns on either side of the Entry door and drive way gate are raised to match the neve level of the wall. Electric conduit extends through the top and has been taped. dozer
IMG_2547.jpg
Another ColumnElectric conduit extends through the top and has been taped. Note the new bricks used to top up the column are the nice decorative ones (3.5 b each) which look much nicer than the ones on the bottom. dozer
IMG_2548p-1.jpg
Topped Beam Decorative Pattern FinishedThe top beam has had the corners rendered in a pattern matching the bottom part of the column.dozer
IMG_2567.jpg
Column LightingElectrician preparing to install the lighting on the top of each column. dozer
IMG_2594.jpg
Security Metal affixed to Top of WallThis security metal was fabricated here and then attached via anchor bolts. dozer
IMG_2597.jpg
Welding Security MetalMost of the welding was done prior to putting each section in place (each section being more than 2 meters). Here two adjacent sections are being welded together. dozer
IMG_2811.jpg
Painting Decorative MetalThis is a shot of partially painted decorative metal. We had a couple of day laborers paint the metal and they actually did a good job. First the old metal was sanded and prepped and my favorite metal paint Glipton TOA 465 was applied. dozer
 