DSC05052.jpg
Original WellThe stone aggregate (used to line the line the well) footprint was eventually concreted over. dozer
IMG_2875.jpg
Concrete RemovedAll of the old top concrete layer was busted out and removed.dozer
IMG_2881.jpg
Rerouted ElectricalSome electrical that ran encased in concrete prior needed to be re-routed. Add one to the reasons over time I don't like encasing anything in concrete. 1 commentsdozer
IMG_2883.jpg
Forming GutterThe gutter will run along the exterior of the wall. Here rebar is placed to form the gutter. dozer
IMG_2891.jpg
Prep WorkThe top concrete layer had already been removed, here is some of the dirt dug in prep for pouring concrete. Forms are starting to be positioned. dozer
IMG_2892.jpg
Forming Sealing LayerThe forms and rebar are set in place to pour the upper level of concrete. The gutter is poured separately. dozer
IMG_2910.jpg
Troweling the SurfaceThe finished surface of the upper level of the pour with concrete all around the well. dozer
 