happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Other > Perimeter Wall

DSC00039.jpg
The support post is poured around the adjacent blocks using a form structure. dozer
DSC00040~0.jpg
A wall section (front and side) with completed support post structures. dozer
DSC04139.jpg
To apply decorative tiles around a perimeter wall foundation post, the brick layer creates a rig which sits on top of the post and has 'straight-line' nylon line running down the side. (28-Jun-04)dozer
DSC04140.jpg
Laying a brick in place.dozer
DSC04142.jpg
Stucco being applied to the perimeter wall.dozer
DSC04143.jpg
Finishing touches applied to the top of the perimeter wall foundation post.dozer
DSC05018.jpg
Finished wall section with some decorative brickwork on the entry posts. (06-Jul-04)dozer
DSC05122.jpg
Painted and finished wall section with decorative metal. (15-Aug-04)dozer
20 files on 2 page(s) 2

Debug Info 
Debug Output: show / hide