Small bathroom water entry for the toilet and bottom washer. The 4" PVC is the toilet exhaust. dozer
|
|
The small bathroom being prepared for a cement pour. Sand has been leveled and the wire put in place. The bathroom will be sloped to allow the runoff water to flow to the floor drain.dozer
|
|
Small bathroom after the cement pour. The 4" PVC on the left is the toilet exhaust and the 3" on the right is the shower stall exhaust. (03-Jun-04)dozer
|
|
Large bathroom plumbing layout. On the left is the general water runoff PVC. On the right is the water entry, bathtub exhaust, toilet exhaust and finally the sink exhaust pipe.dozer
|
|
The large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozer
|
|
Water runoff pipes run into the septic like this. (05-Jun-04)dozer
|
|
Large bathroom after cement has just been poured. (05-Jun-04)dozer
|
|
Concrete is poured over the hot and cold water pipes. Also note the septic exhaust. (07-Jun-04)dozer
|
|
Concrete walkway in the rear being finished off, showing two septic exhausts. Note also the metal brackets on the wall which are used as a support for the water heater which is a wall mount and resides in the kitchen.dozer
|
|
Large bathroom after tiling is almost complete. The water runoff drain is on the far left (near the bathtub area). The bathtub still needs to be plumbed in. (12-Jun-04)dozer
|
|
The plumber is applying tile grout. (14-Jun-04)dozer
|
|
This shows the base for the shower enclosure in the small bathroom. Tile is being applied. (19-Jun-04)dozer
|
|