happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Details > Bathroom

DSC03112.jpg
Small bathroom water entry for the toilet and bottom washer. The 4" PVC is the toilet exhaust. dozer
DSC03114.jpg
The small bathroom being prepared for a cement pour. Sand has been leveled and the wire put in place. The bathroom will be sloped to allow the runoff water to flow to the floor drain.dozer
DSC03119.jpg
Small bathroom after the cement pour. The 4" PVC on the left is the toilet exhaust and the 3" on the right is the shower stall exhaust. (03-Jun-04)dozer
DSC03123.jpg
Large bathroom plumbing layout. On the left is the general water runoff PVC. On the right is the water entry, bathtub exhaust, toilet exhaust and finally the sink exhaust pipe.dozer
DSC03124.jpg
The large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozer
DSC03149.jpg
Water runoff pipes run into the septic like this. (05-Jun-04)dozer
DSC03155.jpg
Large bathroom after cement has just been poured. (05-Jun-04)dozer
DSC03166~0.jpg
Concrete is poured over the hot and cold water pipes. Also note the septic exhaust. (07-Jun-04)dozer
DSC04006.jpg
Concrete walkway in the rear being finished off, showing two septic exhausts. Note also the metal brackets on the wall which are used as a support for the water heater which is a wall mount and resides in the kitchen.dozer
DSC04011.jpg
Large bathroom after tiling is almost complete. The water runoff drain is on the far left (near the bathtub area). The bathtub still needs to be plumbed in. (12-Jun-04)dozer
DSC04021~0.jpg
The plumber is applying tile grout. (14-Jun-04)dozer
DSC04043.jpg
This shows the base for the shower enclosure in the small bathroom. Tile is being applied. (19-Jun-04)dozer
44 files on 4 page(s) 2

Debug Info 
Debug Output: show / hide