Home > User galleries > chiyman > Chiyman's Low Cost House - Part 2 - Ground slab and ground to first floor cloumns

DSCF4961.JPG
The waste from the downstairs toilet will be collected in this tank formed from precast concrete rings - this one is 4 rings deep.chiyman
DSCF4956.JPG
Ground slab formwork completed and ready for the pourchiyman
DSCF4951.JPG
Bathroom drainage connections placed befor pouring the ground floor slabchiyman
DSCF4952.JPG
Ground floor slab reinforcement placed and tied into the ground floor beam steelwork.chiyman
DSCF4953.JPG
Ground floor slab formwork almost completed.chiyman
DSCF4955.JPG
An evening meal washed down with plenty of Thai whisky at the end of a hard days work.chiyman
DSCF4957.JPG
Ground slab formwork completed and ready for the pour. Concrete mixer, sand, stone and cement ready.chiyman
DSCF4958.JPG
Ground floor Bathroom waste water pipework placed in position.chiyman
DSCF4959.JPG
Toild waste receptical and blue pipe which will discharge water from the shower and wash hand basin.chiyman
DSCF4960.JPG
The connection pipe from the toilet to the collection tank.chiyman
DSCF4962.JPG
Ground floor slab formwork completed and ready for concrete pour the next day. The bathroom (with the blue pipe sticking out) will be formed at a lower level and cast seperatelychiyman
DSCF4963.JPG
Ground floor formwork completedchiyman